Condition requiring a Construction Surface Water Management Plan? We prepare phased plans that control runoff, silt and pollution during construction — essential where works are near a watercourse, SSSI or sensitive receptor.
During construction, stripped ground and stockpiles generate silt-laden runoff that can pollute nearby watercourses and breach environmental law. Where a site is near a watercourse, a designated site such as an SSSI, or any sensitive receptor, the LPA, Environment Agency or Natural England will often require a Construction Surface Water Management Plan — secured by condition — before works begin.
We prepare a phased plan setting out how surface water, silt and potential pollutants are managed across each stage of the build: interception and settlement of runoff, silt control measures, pollution prevention, controlled dewatering and discharge, and monitoring. The plan follows recognised CIRIA guidance and the Environment Agency’s pollution prevention principles, and is written to discharge the condition and keep you compliant on site.
Works near water or a protected site? Send us the location and we’ll advise.
A condition requiring a construction surface water or environmental management plan to be approved before works begin — the usual trigger.
Where runoff could reach a river, stream or drain, silt and pollution control during the build is essential and expected.
Sites near designated nature conservation sites attract Natural England interest and require robust construction-phase controls.
Extensive cut, fill and stockpiling generates significant silt-laden runoff that must be intercepted and settled.
Where the Environment Agency or Natural England has flagged construction-phase water quality, a sound CSWMP resolves it.
The surface water element of a wider Construction Environmental Management Plan, which we can prepare or contribute to.
Controlling run-off, silt and pollution while the site is being built.
The construction phase is often when a site causes the most flooding and pollution — stripped ground, stockpiles and half-built drainage all shed silt-laden water fast. A Construction Surface Water Management Plan (CSWMP) sets out how run-off will be controlled during the works, and is increasingly required by planning condition, by the Environment Agency for sites near watercourses, and by the LLFA.
How run-off is captured and attenuated during construction — temporary basins, cut-off ditches and the sequencing of permanent drainage so it can be used early.
Silt fences, settlement lagoons, wheel washes and fuel storage controls to stop sediment and contaminants reaching drains and watercourses, drawing on CIRIA construction-phase guidance.
A plan matched to the build programme, with named responsibilities, monitoring and the actions to take in heavy rainfall or a pollution incident.
Free, no-obligation fixed-fee quote within 24 hours. All flood zones and LLFAs covered across England and Wales.
Get a Free QuoteOr contact us directly: 07826 705389 •