No mains sewer to connect to? We prepare the Foul Drainage Assessment (FDA1) that planning needs — justifying the drainage hierarchy and specifying a compliant septic tank or package treatment plant under the General Binding Rules — plus full foul drainage design where a scheme requires it.
Where a development cannot connect to the public foul sewer, the LPA will usually require a Foul Drainage Assessment on the Government’s standard FDA1 form. It demonstrates that the proposed means of foul disposal has been chosen correctly against the drainage hierarchy — mains connection first, then a package treatment plant, and only then a septic tank — and that the discharge will comply with the Environment Agency’s General Binding Rules or, where needed, a permit.
We complete the FDA1, justify the chosen solution, specify a suitable septic tank or package treatment plant, and where discharge is to ground we arrange the percolation testing needed to size the drainage field to Building Regulations Part H and BS 6297. The result is a submission-ready assessment that satisfies both planning and Building Control.
Beyond the FDA1, many sites need the foul system fully designed — to connect to the public sewer, discharge a planning condition, or build from.
Where a public foul or combined sewer is available, we establish the connection point, available capacity and the agreement needed to connect.
Foul network layout, pipe sizing, gradients and falls, with full calculations to support technical approval and construction.
Foul pumping station and rising main design where a site can’t drain to sewer by gravity.
Discharging pre-commencement or pre-occupation foul drainage conditions, co-ordinated with surface water where required.
Discharging a foul drainage condition? Send your decision notice and the condition wording and we’ll confirm what the design needs to demonstrate. Foul design is often co-ordinated with surface water under a SuDS drainage strategy and detailed drainage design.
Rural site with no mains drainage? Tell us the location and we’ll advise.
Where the nearest public foul sewer is too far or too costly to connect to, an FDA1 justifies an off-mains solution.
Conditions requiring foul drainage details to be approved before commencement or occupation — we discharge these too.
New homes in the countryside almost always rely on a package treatment plant or septic tank, which the FDA1 must support.
Change of use and barn conversions frequently need a fresh foul drainage assessment even where one existed before.
Upgrading an old septic tank to a compliant package treatment plant, including bringing discharges within the General Binding Rules.
Either route has specific compliance requirements; we identify whether the General Binding Rules suffice or an EA permit is needed.
Free, no-obligation fixed-fee quote within 24 hours. Off-mains foul drainage assessments and full foul drainage design, across England and Wales.
Get a Free QuoteOr contact us directly: 07826 705389 •