LLFA asking you to prove infiltration before they’ll accept your drainage? We arrange and witness BRE 365 soakaway tests, calculate the infiltration rate, and design compliant infiltration SuDS — or the attenuation fallback if infiltration fails.
Infiltration sits at the top of the SuDS drainage hierarchy, and most LLFAs now require it to be properly tested — not assumed — before they will accept any drainage strategy. The recognised method is BRE Digest 365, which determines the soil infiltration rate from a series of full fill-and-empty trial pit tests measured over the effective storage depth.
We arrange and witness the BRE 365 testing, calculate the design infiltration rate from the worst-performing cycle, and use it to design soakaways, permeable paving or infiltration basins sized for events up to the 1 in 100-year plus climate change. Where infiltration is not viable — impermeable clay, Gault mudstone, or a high groundwater table — we evidence that clearly and move down the hierarchy to an attenuation-based strategy with a restricted discharge.
Not sure if your ground will infiltrate? Tell us your site and soils and we’ll advise before you commit.
LLFAs routinely require infiltration to be tested and discounted before attenuation is accepted. A drainage strategy that assumes infiltration without BRE 365 data is usually rejected.
Conditions frequently require infiltration testing to support the detailed drainage design. BRE 365 results are the evidence the LLFA needs to discharge them.
Any soakaway, infiltration trench or permeable paving sub-base must be sized using a measured infiltration rate — a default value will not be accepted at detailed design.
Even smaller schemes draining to a soakaway need a test to BRE 365 to confirm the ground can take the runoff without surcharging.
Where permeable paving provides infiltration as well as treatment, the infiltration rate governs whether storage or an outfall is also required.
Infiltration may be restricted where contamination or made ground is present; we assess suitability alongside the test results and the SuDS hierarchy.
The site test that decides whether infiltration drainage is viable.
Infiltration — soaking rainwater into the ground — sits at the top of the SuDS hierarchy, so LLFAs expect it to be considered first. BRE Digest 365 is the recognised method for testing whether your ground can actually accept the water. A trial pit is excavated, filled and monitored to measure the soil infiltration rate, and the result feeds directly into the design (or rules infiltration out).
A trial pit is dug to the proposed soakaway depth, filled with water and the fall in level timed. The test is normally repeated three times to give a reliable infiltration rate.
The infiltration rate sizes the soakaway or infiltration feature for the 1 in 100 year event plus climate change, and confirms the half-drain time meets the standard. Low rates, clay, or a high water table can rule infiltration out.
Soakaways must be at least 5 m from buildings and 2.5 m from boundaries, and clear of the groundwater table — we check these before recommending infiltration.
Free, no-obligation fixed-fee quote within 24 hours. All flood zones and LLFAs covered across England and Wales.