Many LLFAs require their SuDS pro forma completed and submitted with a surface water drainage strategy to validate an application or discharge a condition. We complete the pro forma and provide the calculations behind it.
A growing number of Lead Local Flood Authorities now require their own surface water drainage pro forma (sometimes called a SuDS checklist or drainage assessment form) to be completed and submitted alongside a drainage strategy — either to validate a major application or to discharge a surface water drainage condition. A blank or unsupported pro forma is routinely rejected, holding up determination.
We complete the specific pro forma for your LLFA and provide the technical drainage strategy that evidences every answer on it — runoff rates, storage volumes, the drainage hierarchy and the SuDS components — so the submission stands up to LLFA scrutiny first time. The work is prepared to the non-statutory technical standards for SuDS (Defra, 2015), CIRIA C753 and your LLFA’s local standards.
Send us your LLFA and planning reference and we’ll confirm exactly what they need. Get a free quote.
Most LLFAs require a completed surface water pro forma and drainage strategy as a validation requirement for major development (10+ dwellings or 0.5ha+).
Where a surface water drainage condition has been imposed, the LLFA pro forma plus a detailed strategy is the standard route to discharge it.
If the LLFA has objected on drainage grounds, a properly completed pro forma backed by calculations is the quickest way to resolve it. See our objection response service.
Some authorities now ask for a simplified drainage pro forma even on minor and householder applications, particularly in surface-water flood risk areas.
Redevelopment must usually demonstrate a betterment in runoff rate; the pro forma captures the existing versus proposed position, which we evidence with calculations.
Where a complete strategy is required rather than just a pro forma, see our SuDS drainage strategy service.
The standard form many councils now require with every drainage submission.
Many Lead Local Flood Authorities require a completed SuDS proforma (or checklist) with a planning application or condition discharge. It summarises the drainage proposals in the format the LLFA's drainage officer uses to review them — site details, discharge hierarchy, run-off rates, storage volumes, treatment, maintenance — and an incomplete or inconsistent proforma is a fast track to an objection. We complete it alongside the drainage strategy it summarises so the two agree.
Site and development details, the proposed point of discharge and why (the SuDS hierarchy), greenfield and developed run-off rates, attenuation volumes, water quality treatment, exceedance routes and the maintenance arrangements.
Proforma formats differ between LLFAs. We use the correct current version for your council and know what its drainage officers look for.
The proforma is only accepted with the strategy, calculations and drawings behind it — we provide the full package so nothing is queried.
Free, no-obligation fixed-fee quote within 24 hours. All flood zones and LLFAs covered across England and Wales.
Get a Free QuoteOr contact us directly: 07826 705389 •